SI No. |
PROJECT NAME |
SCOPE OF WORK |
CLIENT |
MAIN CONTRACTOR |
SUB-CONTRACTOR |
1 |
CONSTRUCTION OF FUTURE DOCK AT SPORT CITY |
CROSSING WORKS |
GARGASH CONTRACTING |
ORCHID CONTRACTING |
AL QARO ROADS CONTRACTING |
2 |
INTERLOCK FIXING & LANDSCAPING WORKS @ SHEIKH ZAYED METRO STATION |
INTERLOCK FIXING & LANDSCAPING WORKS |
GREENLAND LANSCAPING |
AL QARO ROADS CONTRACTING |
|
3 |
KERBSTONE & INTERLOCK WORKS AT AL BATEEN ABUDHABI |
KERBSTONE & INTERLOCK WORKS |
BIN HARMAL |
AL TURATH ENGINNERING |
AL QARO ROADS CONTRACTING |
4 |
EMIRATES AVIATION COLLEGE AEROSPACE & ACADEMIC STUDIES AT ACADEMIC CITY |
INTERLOCK FIXING |
HEILBRONN CONTRACTING |
AL QARO ROADS CONTRACTING |
|
5 |
SHK. MANSOUR AL NAHYAN PRIVATE VILLA AT AJBAN ABUDHABI |
PAVEMENTS AND ROAD WORKS |
SHK.MANSOUR AL NAHYAN |
AL QARO ROADS CONTRACTING |
|
6 |
RASHIDIYA METRO STATION |
INFRASTRUCTURE, ROAD WORKS |
RTA |
AL FAJAN GEN. CONTRACTING |
AL QARO ROADS CONTRACTING |
7 |
AL GARHOUD METRO STATION |
INFRASTRUCTURE, ROAD WORKS |
RTA |
AL FAJAN GEN. CONTRACTING |
AL QARO ROADS CONTRACTING |
8 |
AL KHAWANEEJ RESIDENTIAL VILLA |
LANDSCAPING WORKS |
PRIVATE |
AL QARO ROADS CONTRACTING |
|
9 |
AL QUSAIS RESIDENTIAL VILLA |
LANDSCAPING WORKS |
PRIVATE |
AL QARO ROADS CONTRACTING |
|
10 |
PETROL STATION STOCKYARD AT SWEIHAN |
FORMATION, PREPARATON, ROADBASE, SUB BASE LAYERING & INTERLOCK WORK (60,000 M2) |
ADPC |
EMCO |
AL QARO ROADS CONTRACTING |
11 |
MUSSAFA COMMUNITY |
INTERLOCK FIXING AND ASPHALT WORKS |
TRANSGULF CONTRACTING |
AL QARO ROADS CONTRACTING |
|
12 |
JUMEIRAH ISLAND DUBAI |
ROAD WORKS AND ASPHALT WORKS |
TARGET CONTRACTING |
AL QARO ROADS CONTRACTING |
|
13 |
ROAD MARKING AT MILLINEUM HOTEL |
ROAD MARKING |
AL ATTAR GROUP |
AL QARO ROADS CONTRACTING |
|
14 |
DP WORLD T3 CONTAIANER TERMINAL AT JEBEL ALI |
FORMATION, PREPARATON AND ROADBASE LAYERING OF CONTAINER TERMINAL (STOCK YARD) |
JEBEL ALI PORTS |
ARABIAN COAST CONTRACTING |
AL QARO ROADS CONTRACTING |
15 |
REINSTATEMENT OF VARIOUS TYPES OF PAVEMENT IN VARIOUS LOCATION IN DUBAI |
PAVEMENTS WORKS |
DEWA |
AL QARO ROADS CONTRACTING |
AL QARO ROADS CONTRACTING |
16 |
BUSINESS BAY PHASE 1&2 - LANDSCAPING AT MAIN ENTRANCE OF BUSINESS BAY AND AL KHAIL ROAD |
CUT, FILL, EXCAVATION, DISPOSAL & GRADING |
DUBAI PROPERTIES |
GULF LANDSCAPE |
AL QARO ROADS CONTRACTING |
17 |
INFRASTRUCTURE WORKS RELATED TO TRAFFIC MANAGEMENT SYSTEM |
INFRASTRUCTURE & ROADWORKS |
DNATA/EMIRATES GROUP |
HEILBRONN CONTRACTING |
AL QARO ROADS CONTRACTING |
18 |
CONSTRCUTION OF ACCESS ROAD AT YAS ISLAND POLICE STATION ABU DHABI |
ROAD WORKS (ASPHALT WORK) |
MACE |
AL QARO ROADS CONTRACTING |
|
19 |
RUGBY PITCH #3 FOR EMIRATES GROUP (SEVEN) |
LANDSCAPING WORKS |
EMIRATES GROUP |
HEILBRONN CONTRACTING |
AL QARO ROADS CONTRACTING |
20 |
CONSTRUCTION OF ROADS AT SWEIHAN ABU DHABI |
ROAD WORKS (ASPHALT WORK) |
ADPC |
EMCO |
AL QARO ROADS CONTRACTING |
21 |
CONSTRUCTION OF ROADS AT AL TAWEELAH ABUDHABI |
ROAD WORKS (ASPHALT WORK) & FIXING OF & SPEED HUMPS |
ADPC |
EMCO |
AL QARO ROADS CONTRACTING |
22 |
MILLINEUM HOTEL AT SHEIK ZAYED ROAD |
INFRASTRUCTURE, ROAD WORKS AND CABLE PROTECTION |
AL ATTAR GROUP |
AL QARO ROADS CONTRACTING |
|
23 |
PROPOSED CHILLED WATER NETWORK PIPING FOR ELITE 4 BUILDING AT DUBAI SPORT CITY |
ROAD CUTTING, EXCAVATION, FIXING OF 2,8" INSOLATED PIPE & ASPHALT LAYING |
EMICOOL |
AL QARO ROADS CONTRACTING |
|
24 |
CHILLED WATER NETWORK PFROM VENETIAN STYLE TO ELITE BUILDING 1,2,4 & CRICKET STADIUM AT DUBAI SPORT CITY |
EXCAVATION & BACKFILLING |
EMICOOL |
AL QARO ROADS CONTRACTING |
|
25 |
EMIRATES PARK HOTEL INFRASTRUCTURE & ROADWORKS |
INFRASTRUCTURE AND ROAD WORKS |
EMIRATES GROUP |
HEILBRONN CONTRACTING |
AL QARO ROADS CONTRACTING |
26 |
CONSTRUCTON OF 12 NOS. OF RTA BUS STOP AT DUBAI SPORT CITY |
INTERLOCK FIXING, SIGNBOARDS, ROAD MARKING & ASPHALT |
DUBAI SPORT CITY |
AL QARO ROADS CONTRACTING |
|
27 |
ROAD CROSSING FOR ELITE 5 BUILDING AT DUBAI SPORT CITY |
ROAD CUTTING, EXCAVATION, FIXING OF 2,8" INSOLATED PIPE & ASPHALT LAYING |
EMICOOL |
AL QARO ROADS CONTRACTING |
|
28 |
ROAD CROSSING FOR ELITE 5 BUILDING AT DUBAI SPORT CITY |
ROAD CUTTING, EXCAVATION, FIXING OF 2,8" INSOLATED PIPE & ASPHALT LAYING |
EMICOOL |
AL QARO ROADS CONTRACTING |
|
29 |
R820/2B - IMPROVEMENTS OF ROADS IN RUWAIYAH DUBAI |
ASPHALT WORK |
ENGINEERING OFICE |
AL QARO ROADS CONTRACTING |
|
30 |
GROUND WATER DISTRIBUTION -2 AT ARABIAN RANCHES GOLF COURSES |
DEEP EXCAVATION AND PIPE LAYING (DIA. 300MM,250MM, 110MM & 82MM) |
EMAAR |
ARABIAN COAST CONTRACTING |
AL QARO ROADS CONTRACTING |
31 |
LANDSCAPING WORK AT ARABIAN RANCHES GOLF COURSES |
LANDSCAPAING |
EMAAR |
ARABIAN COAST CONTRACTING |
AL QARO ROADS CONTRACTING |
32 |
PROPOSED CONSTRUCTION OF REMAINING WORK FOR BLOCK A1, BRADENTON SCHOOL PLOT NO. 682-1478, DUBAI SPORT CITY |
SUPPLY AND INSTALLATION OF SOFT AND HARD LANDSCAPE |
DUBAI SPORT CITY |
ALQARO ROADS CONTRACTING |
|
33 |
ROAD CROSSING AT ROAD A3 AT DIP |
ASPHALT REINSTATEMENT |
EMICOOL |
ALQARO ROADS CONTRACTING |
|
34 |
UNDERGROUND CHILLED WATER PIPE NETWORK FOR EMICOOL PLANT-1 AT DIP |
ROAD CUTTING, EXCAVATION, FIXING OF CHILLED WATER PIPE & ASPHALT LAYING |
EMICOOL |
ALQARO ROADS CONTRACTING |
|
35 |
OPEN CUT ROAD CROSSING WORK AT PALAZZO VERSACE AND D1 TOWER CULTURE VILLAGE - AL JADAF |
INFRASTRUCTURE, ROAD WORKS AND CABLE PROTECTION |
EMICOOL |
ALQARO ROADS CONTRACTING |
|
36 |
PV AND D1 PROJECTS, CULTURE VILLAGE - AL JADAF |
EXCAVATION & PIPE LAYING |
ENSHAA |
ALQARO ROADS CONTRACTING |
|
37 |
PV AND D1 PROJECTS, CULTURE VILLAGE - AL JADAF |
PREPARATION OF ACCESS ROAD |
ENSHAA |
ALQARO ROADS CONTRACTING |
|
38 |
REMOVAL OF EXISTING ASPHALT ROAD AND REINSTATEMENT AT MEADOWS COMMUNITY |
ASPHALT ROAD REINSTATEMENT |
EMRILL |
ALQARO ROADS CONTRACTING |
|
39 |
INSTALLATION OF CHILLED WATER PIPE NETWORK AT DIP |
ROAD CUTTING, EXCAVATION, FIXING OF CHILLED WATER PIPE & ASPHALT LAYING |
EMICOOL |
GARGASH INSAFOAM |
AL QARO ROADS CONTRACTING |
40 |
ASPHALT WORK AT MASTER COMMUNITY AT DUBAI SPORT CITY |
ASPHALT ROAD REINSTATEMENT |
DUBAI SPORT CITY |
AL QARO ROADS CONTRACTING |
|
41 |
SUPPLY & INSTALLATION OF GUARD RAILS FOR STREET LIGHTING AT DIP |
GUARD RAILS INSTALATION |
DIP |
AL QARO ROADS CONTRACTING |
|
42 |
INSTALLATION OF DROP KERBSTONE AT DIP |
DROP KERBSTONE FIXING |
DIP |
AL QARO ROADS CONTRACTING |
|
43 |
ROAD REPAIR WORK AR ROADS A401 AT DIP |
ASPHALT ROAD REINSTATEMENT |
DIP |
AL QARO ROADS CONTRACTING |
|
44 |
INSTALLATION OF STREET LIGHTING WORK AT ROAD A3, A301 & A401 AT DIP |
CIVIL & ELECTRICAL WORKS |
DIP |
AL QARO ROADS CONTRACTING |
|
45 |
VARIOUS MAINTENANCE WORKS AT DIP |
SEWERAGE PIPE REPAIR/ACCESS ROAD MAINTENANCE/STREETLIGHT MAINTENANCE ETC. |
DIP |
AAL QARO ROADS CONTRACTING |
|
46 |
UNDERGROUND CHILLED WATER PIPE NETWORK EXTENSION FOR PLOTS 597-1034 & 597-1120 |
CIVIL WORKS |
EMICOOL |
VOLTAS ELECTROMECHANICAL |
AL QARO ROADS CONTRACTING |
47 |
CONSTRCUTION OF FOOTPATH AND ACCESS ROAD FOR PLOT 421-20276 AT AL WARQAA |
INTERLOCK PAVING WORKS |
ROTANA CONTRACTING |
AL QARO ROADS CONTRACTING |
|
48 |
EXTERNAL MODIFICATION OF MAZAYA CENTER AT BUSINESS BAY |
INTERLOCK PAVING WORKS |
ARTEC |
AL QARO ROADS CONTRACTING |
|
49 |
CONSTRUCTION OF U -TURN & DROP OFF PARKING AT JW MARRIOTT HOTEL |
INTERLOCK PAVING WORKS |
MIX FIX TECHNICAL SERVICES |
AL QARO ROADS CONTRACTING |
|
50 |
ROAD REPAIR AT ROAD B403AT DIP |
ASPHALT REINSTATEMENT |
DIP |
AL QARO ROADS CONTRACTING |
|
51 |
PRECAST CONCRETE PAVING WORKS FOR FOOTPATH AND ROAD ACCESS TO PALAZZO VERSACE HOTEL & D1 TOWER |
PRECAST CONCRETE PAVING WORKS |
ENSHAA |
AL QARO ROADS CONTRACTING |
|
52 |
ASPHALT REINSTATEMENT AND PIPE REPAIR AT MEADOWS 1 |
ASPHALT REINSTATEMENT AND PIPE REPAIR |
EMAAR |
EMRILL |
ASPHALT REINSTATEMENT AND PIPE REPAIR |
52 |
REMOVAL OF HUMPS & CHILLED WATER PIPING EXTENSION FOR ELITE 3,6&7 AT SPORT CITY |
ASPHALT REINSTATEMENT AND PIPE CONNECTION |
EMICOOL |
ASPHALT REINSTATEMENT AND PIPE REPAIR |
|
53 |
MANHOLE CONSTRUCTION AT DUBAI SPORTS CITY |
CONSTRUCTION OF MANHOLE |
SPORT CITY |
MANHOLE CONSTRUCTION AT DUBAI SPORTS CITY |
Alqaro Launched New Website in tie up with Austrix Technologies